LE Surfaces is pleased to announce that initial production at its facility in Thailand has commenced. The factory currently has eight operating production lines with an additional two more coming on-line by September of 2021. The factory, once fully built out, will house 40 production lines.
LE Surfaces begins slab production in Thailand
![Workers inspecting quartz at a factory](https://lesurfaces.com/wp-content/uploads/2024/03/LE_NEWS_051521-1024x576.jpg)